The last culvert went in at the Cowpoke/Iris Ridge Interection on Friday. A full 60 feet long, it took three sections of culvert to span the entire length. That area becomes a BOG in the Spring. Thanks to our Culvert Committee for four days of work to get all the culverts installed.
Be watching for more progress on the roads
![](https://static.wixstatic.com/media/7bc72d_6abd31369abf42d298e58219db25a9a8~mv2.jpg/v1/fill/w_980,h_1307,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/7bc72d_6abd31369abf42d298e58219db25a9a8~mv2.jpg)
over the next few weeks.